SINGAPORE (Dec 6): CSC Holdings, the foundation and geotechnical engineering specialist, has secured foundation contracts for the Kim Chuan Depot Extension and the underground Keppel MRT Station and its associated tunnels, on the Circle Line 6 (CCL6).

For the Kim Chuan Depot Extension project, CSC will be lending its geotechnical expertise for the construction of bored piles, contiguous board piles and the installation of king posts at the depot.

This extension will nearly double the capacity of the fully underground depot, allowing it to accommodate 133 trains as compared to its current capacity of 70 trains. The depot will also house 550 buses above ground.

To continue reading,

Sign in to access this Premium article.

Subscription entitlements:

Less than $9 per month
3 Simultaneous logins across all devices
Unlimited access to latest and premium articles
Bonus unlimited access to online articles and virtual newspaper on The Edge Malaysia (single login)

Related Stories

Stay updated with Singapore corporate news stories for FREE

Follow our Telegram | Facebook