Australia-Asia Powerlink (AAPowerLink)

Australia-to-Singapore solar project Sun Cable no longer viable, says billionaire investor - THE EDGE SINGAPORE

Sustainability

Australia-to-Singapore solar project Sun Cable no longer viable, says billionaire investor

The 4,200km submarine cable was scheduled to begin construction in 2024. It entered into voluntary administration last week.
Singapore-based Sun Cable collapses, threatening Australia-Asia PowerLink solar power project - THE EDGE SINGAPORE

Sustainability

Singapore-based Sun Cable collapses, threatening Australia-Asia PowerLink solar power project

Sun Cable's 4,200km submarine cable was scheduled to begin construction in 2024.

Company in the news

Sun Cable signs MOU with Indonesia's energy ministry at G20 business summit

The project is forecast to potentially inject a total of US$2.5 billion into the Indonesian economy over its lifespan.
Surbana Jurong joins Australia-Asia Powerlink, project can supply 15% of Singapore's power needs from 2028 - THE EDGE SINGAPORE

Sustainability

Surbana Jurong joins Australia-Asia Powerlink, project can supply 15% of Singapore's power needs from 2028

The project is expected to begin construction from late 2023, with the first supply of power expected here in 2027.
×