The solar farm is expected to be operational by 3Q2025.
EDP, through EDP Renewables (EDPR) APAC, has signed a 20-year power purchase agreement (PPA) with Amazon.
The long-term contract signed with Amazon is linked to EDP’s 44 megawatt-peak (MWp) ground-mounted utility-scale solar farm located in Fukushima. The solar farm will be structured with 63,000 solar panels and is expected to generate over 48 gigwatt-hours (GWh) of energy annually, offsetting more than 20,500 metric tonnes of carbon emissions, says EDP on Jan 29.

